by Mark | May 22, 2019 | Case Studies, News, Sport Surface Projects
Following a Flood at the Sobell Leisure Centre the Sprung Floor within the sports hall was replaced in record time by 4Runner Sport Surfaces. Having installed the performance sprung floor when the Leisure centre was built in 2014, 4Runner were able to leap into action...
by Mark | May 1, 2019 | Case Studies, News, Sport Surface Projects, Testimonials
Following a burst water pipe at Beal Academy in Ilford, 4Runner Sport Surfaces were on hand to carry out the removal of the damaged floor, the drying of the subfloor and the installation of a new sprung floor to the sports hall. Due to the amount of flood water...
Recent Comments