by Mark | Oct 15, 2020 | Case Studies, News
4Runner work closely with Sport Sheffield located at the Goodwin Centre at the Sheffield University in maintaining its sport facilities. Having recently carried out a deep clean of the sports hall floor and repainting the various games lines to bring the sports hall...
by Mark | Oct 15, 2020 | Case Studies, News
4Runner Sport Surfaces worked closely with Aspire defence to assist in selecting the most appropriate surface for the Gym area in the new Intermediate Care Facility At Bulford Camp. The Gym area was to house various gym equipment from Cardio Vascular machines though...
by Mark | Oct 2, 2020 | Case Studies, News
4Runner sport Surfaces was selected by Wellsway Multi Academy Trust to carry out the repair to their Beech timber sports floor following water ingress. The work was carried out very carefully due to the presence of underfloor heating pipes just beneath the timber...
by Mark | Oct 2, 2020 | Case Studies, News, Sport Surface Projects
Main Sports Hall Having worked closely with the Priory Learning Trust and GLDM Consultants previously, 4Runner were selected to carry out the refurbishment of Worle Community School Indoor Sports Facilities. Sports Hall The main sports hall, which consisted of a...
by Mark | Aug 21, 2019 | Case Studies, News, Sport Surface Projects
Following the successful replacement of the flood damaged floor at Beal High School, 4Runner Sport Surfaces were asked to Refurbish the Small Gym on their old campus. The building had not been used for several years due to the state of the old timber floor and...
by Mark | May 22, 2019 | Case Studies, News, Sport Surface Projects
Following a Flood at the Sobell Leisure Centre the Sprung Floor within the sports hall was replaced in record time by 4Runner Sport Surfaces. Having installed the performance sprung floor when the Leisure centre was built in 2014, 4Runner were able to leap into action...
Recent Comments