by Mark | May 1, 2019 | Case Studies, News, Sport Surface Projects, Testimonials
Following a burst water pipe at Beal Academy in Ilford, 4Runner Sport Surfaces were on hand to carry out the removal of the damaged floor, the drying of the subfloor and the installation of a new sprung floor to the sports hall. Due to the amount of flood water...
by Mark | Dec 17, 2018 | Case Studies, News, Sport Surface Projects
We would like to wish everyone a Merry Christmas and a Prosperous New Year. If you are looking to refresh or improve your facilities in the New Year then please contact us. We can provide a one stop solution to meet your needs: New Sport Surfaces Sports...
by Mark | Mar 2, 2017 | Case Studies, News, Sport Surface Projects, Testimonials
We’re Liking the BBC Ident featuring the Osprey Wheelchair Rugby Team at Llantrisant Leisure Centre on our System K sprung floor system finished with DLW Linodur, colour Sporty Black. This colour provides a striking and strong line marking contrast. This...
by Mark | Jul 4, 2016 | Case Studies, News, Sport Surface Projects
Following earlier works at the British Forces School in Naples, 4Runner Sport Surfaces returned to the school and installed a new Sport Surface. During a heavy winter storm, rain water entered the sports hall and ruined the old floor, this was removed...
by Mark | Apr 28, 2016 | Case Studies, News, Sport Surface Projects
4Runner were approached by Babcock International Group (Defence & Security Infrastructure) to assist with the design and implementation of various works at the British Forces School near Naples in Italy. The works consisted of a new drainage scheme to alleviate...
by Mark | Apr 28, 2016 | Case Studies, News, Sport Surface Projects
Following damage to the Arena Floor at Sport Central, 4Runner Sport Surfaces were chosen to carry out the refurbishment works to the floor. Working closely with Northumbria Universities Campus Services and the Sport Central Managers, a solution to overcome the flood...
Recent Comments