300+ installations in 20 years so far!

We advise, supply, install, refurbish, and maintain specialist sport surfaces and facilities

Telephone 0117 214 1009 for assistance

4Runner were approached by Babcock International Group (Defence & Security Infrastructure) to assist with the design and implementation of various works at the British Forces School near Naples in Italy. The works consisted of a new drainage scheme to alleviate storm floods, replacement of dangerous decking with a more suitable children’s play surface, design and installation of Brise Soleil sun shading, the design, manufacture and installation of roof access stairs and ladders plus the waterproofing of the external walls. The works took place over the school summer holidays in temperatures reaching over 40 degrees C which produced associated risks not usually experienced working in the UK! All the resources required for the various elements of the works were sourced in the UK and shipped directly to the project. A team of up to 15 engineers worked on the  project to ensure the works were completed to a very high standard and ahead of schedule. Call us on +44(0)1172141009 for us to help with your project!

Screen Shot 2015-10-08 at 14.53.31

BFS Small Courtyard before improvement works

Screen Shot 2015-10-08 at 14.57.02

BFS Small Courtyard following improvement works

Screen Shot 2015-10-08 at 15.06.38

BFS External Damp Proofing to Building

Screen Shot 2015-10-08 at 15.10.16

BFS Brise Soleil Sun Shading

Screen Shot 2015-10-08 at 15.14.54

BFS Roof Ladders

Screen Shot 2015-10-08 at 15.28.50

BFS Attunation Drainage below Play Garden

Screen Shot 2015-10-08 at 15.38.12

BFS Rubber Children’s Surface

Screen Shot 2015-10-08 at 15.42.10

BFS Artificial Grass Play Garden

Screen Shot 2015-10-08 at 15.49.34

BFS Brise Soleil Sun Shading

Screen Shot 2015-10-08 at 15.52.40

BFS Roof Staircase

Screen Shot 2015-10-08 at 15.55.20

British Forces School, Naples, Italy.